Auto Changed Wall Panel Cold Roll Forming Machine with Ce ISO Certification

Auto Changed Wall Panel Cold Roll Forming Machine with Ce ISO Certification

             ATUO Alter Wall Panel Roll Forming Equipment

Material                                               
Material Thickness:.3-.eight mm                                 
Applicable materials:PPGI/GI 
with yield power G235-G350

Feeding Materials Unit

Primary Equipment
With feeding materials guidebook, body body made from H400 type steel by welding
Side wall thickness: Q235 t18mm
Rollers produced from 45# steel,CNC lathes,Warmth Treatment,tough Chrome Coated
Shafts Diameter=ф80/ф85mm ,precision machined
Gear/Sprocket driving,about 12-stage to kind(Shifting Dimension By PLC)
Principal Motor =11KW, Frequency speed control
Chain measurement: one inch with 18teeth
All the screw bolts with quality eight.8
Genuine forming pace 20m/min

Submit CZPT Reducing Unit
Post to cut, cease to chopping,Two items variety of reducing blade layout, no blanking
CZPT motor: seven.5KW 
Cutting tool material: Cr12MoV,Warmth treatment method to HRC58-62 degree 
The slicing energy is presented by the main motor hydraulic station

PLC Management Technique
Manage The Amount And Cutting Duration Instantly
Enter The Manufacturing Knowledge(Production Batch,pcs,Length,and so forth.)On The Contact Monitor ,
It Can End The Creation Automatically.
Merged With: PLC, Inverter, Touch Display screen, Encoder, and so on
PLC:Siemens (German model)/Schneider(Franch brand)
Inverter:Siemens (German model)/Schneider (Franch brand)
7-Inch Coloration Touch Display:Siemens (German brand)/Schneider (Franch brand)
Encoder: Omron (Japan brand name)
Change Base, Point out Light, Power Provide, Intermediate Relay, AC Contactor,
Thermal Relay: Siemens (German manufacturer)/Schneider (Franch brand)
Air Swap: LG-LS(Korea brand)
Reduce-to-Duration Tolerance≤±1 mm
Control Voltage 24V

 

Right after-Sale Support
1. The warranty is 24 months after the client receives the machine.
Within the 24 months, we will courier the replacement parts to the client free of charge
two. We offer technical support for the entire life of our machines
three. We can send our technicians to install and train the workers in the clients’ factories with 
extra cost

Terms Of Trade
one.Minimum order quantity (MOQ): 1 Set
2.Delivery time: about 45 workdays
3.Port of loading: port of HangCZPT
4.Type of payment: by T/T or by L/C
five.Export:to a lot more than sixty nations around the world and locations, which includes ZheJiang , Uk, France, Singapore,
Greece, Australia, USA, Mexico, Brazil, Chile, Xihu (West Lake) Dis.via, Trinidad, Israel, Saudi Arabia, etc

Packing Fashion
Packing technique: Main body of equipment is bare and protected by plastic film(to protect of dust and corrosion),
loaded into container and steadily set in container ideal by steel rope and lock, suitable for lengthy-distance transportation.

Creating time: about 45 workdays after obtained the progress payment
Packing method: with nude packing steadily set in one particular 40 ft container appropriate for
prolonged-distance transportation

ABOUT BMS
Manufacturing unit

EXHIBITION

CERTIFICATION

Client

 

       QUALITY IS OUR Lifestyle!
 IF U ARE Fascinated OUR MACHINES 
       PLEASE Make contact with WITH ME!

       

                                    

                       

   

Auto Changed Wall Panel Cold Roll Forming Machine with Ce ISO Certification