Double Girder Gantry Crane Heavy Duty Crane

Double  Girder Gantry Crane Heavy Duty Crane

CZPT&lparSingle&rpar Girder Gantry Crane &lparMGA&rpar
   
  For outside operating property&comma the gantry crane is the ideal choice&time period  The MG doubel girder gantry crane is a heavy dutry gantry crane&period of time It is mainly for hefty obligation functioning designing&comma such as 24 several hours logisitc garden&comma steel factory&comma fabrication property&comma  mining&comma port&comma railway station and so on&interval The gantry crane can be geared up with hook&comma grab or magnet&comma or mixture of the 3 products&interval

CZPT&colon
The hoist is manufactured by hefty steel body&comma in which hoist motor&comma hydraulic brake and heavy gearbox&interval The working duty could be created to M5&comma M6 or M7&period

Basic safety system&colon
– Overload defense
– Zero-phase safety
– Emergy quit defense
– LT&comma CT limit swap
– Buffer
– Rail grab

Functions
 Designed for indoor or outdoor use&commaheavy duty works&period
 Equipped with higher top quality gearbox&semiSEW&solABB can be as optional according  clients unique need&period of time
 Safety limit switches for stoppers will be offered to avert above touring in all motions 
 Main elcetrical units are Siemens or Schneider manufacturer
 Power supply of Crane by means of Cable drum&solCZPT Chain
 Controlled by means of press button pendant&solRadio remote&solCabin&comma independently or any mixture&period of time
 Tailored based on client’s thorough need&period

Some CZPT Parameter

Ability Up to 300t
Span Up to 120m
Raise height Up to 30m
Lifting Pace two&period5m&solmin ~ 8m&solmin
Cross Travel Pace 16m&solmin ~ 35m&solmin
Lengthy Travel Speed 80m&solmin
Operate Responsibility A5&comma A6
Controlled by Cabinet
Power Provide 380v&sol400v&sol415v&sol460v

result in this is a variety of CZPT solution&comma make sure you kindly provide us the adhering to data&colon
1&time period Lifting potential&time period
2&period of time Span length&period of time &lparrail middle to rail heart&rpar
three&period Lifting top&period &lparhook centre to ground&rpar
four&period of time Do you need bus bar&comma rail from us&quest
five&period Neighborhood energy source 380V 50Hz 3P&quest
6&time period Operating situation&colon What items to raise&quest
seven&period Drawings of operating spot would be appreciated&period 

Double  Girder Gantry Crane Heavy Duty Crane